The SEL Source Control System satisfies the designers’ statutory obligations as required by the Construction Design and Management (CDM) regulations.

The risks inherent with traditional drainage systems are:
  • Operatives working in deep excavations where there is risk of collapse
  • Heavy lifting operations
  • Operatives working within confined spaces
  • Operatives exposure to contaminated sub-strata

The SEL Source Control System avoids these foreseeable risks because it is shallow (generally less than 500mm deep), lightweight, installed above formation levels and contaminated zones.

Extract from CIRIA Document C697 “The SUDS Manual”